   PROJECT REPORT

Study Report About Standards and Regulations of Mini-grid PV/wind Plant
  日期:2008-04-09     【背景色 杏仁黄 秋叶褐 胭脂红 芥末绿 天蓝 雪青 灰 银河白(默认色) 】  【字体:
 

【Report Name】:  Study Report About Standards and Regulations of Mini-grid PV/wind Plant
【Issued Date】:  Sep.2007
【Payment mode】:  Paper
【Price】:  Negotiation Separately
【Contact Phone】:

 62558293-0

 

 

 


【Abstract】
In order to solve "no power" problem in rural area, Chinese government organized and implemented the Pilot Brightness Project , Tibet Ali Area Project via building mini-grid PV/wind power plants. “SDDX” program started in 2002, over 700 power plants were built and supplied electricity successfully in two years. Chinese government cooperated with other countries, and carried out KFW Project, REDP Project and Silk Road Brightness Program and so on. But as the construction time for these projects was limited and mini-grid PV/wind power system involves in many factors, such as civil construction, low-volt electrical network, equipment of power plant and so on, and that relevant quality standard and regulations were incomplete, some of the plants had some problems afterwards. The objective of this project is to study the relevant quality standard and regulations of PV/wind power system, point out the problems and weak point of the existing standard and regulation, put forward reasonable advice to set up a complete system of standard and regulation, which ensure the sustainable development of the plant, to provide better electrical service for local people.
The content of this report is as the following:
   ♦ Study the existing quality standard for PV/wind power system, including wind turbine, PV module, diesel generator, battery, controller, inverter, rural grid and other equipment standard. 
   ♦ Study existing management regulation of PV/wind power plant, including the principle of RE mini-grid plant site, procedure of acceptance inspection, and management regulation. 
   ♦ study and analysis the problems and weak point of existing standard and regulation for PV/wind power system 
   ♦  Put forward reasonable advice to set up a complete system of standard and regulation.

【Content】
1.  Background
1.1   General Situation
1.2   Implemented Pv/Wind Project In Rural Area In China
1.2.1 “Sddx” Program
1.2.2  China-Germany Financial Cooperation In Solar Energy Project In Western
1.2.3  Other Rural Electrification Project
1.3   Significance Of Establishing Complete Quality System Of Standard And Regulations.
1.3.1  Existing Quality Problems Of Pv/Wind Plant
1.3.2  Significance Of Establishing Complete Quality System Of Standard And Regulations.
1.4   Existent System And Mechanism Of Standard In China
1.4.1  Management System Of Chinese Standard
1.4.2  The System Of Chinese Standard
1.4.3  Class Of Standard
1.4.4  Development Procedures Of National Standards
1.4.5  Competent Jurisdiction Unit And Technical Committees
2.  Objective Of The Study
3.  Existing Quality Standards In China

3.1   The Constitution Of The Quality Control System For Re Mini-Grid Power Plant
3.2   Project Management Quality Control
3.3   Relevent Standard For Optimization Design And Of Construction
3.4   Relevant Standards Of General Characteristics Of The System
3.5   Related Standard Of The Subsystem And Key Equipment
3.5.1  The Constitution Of Re Mini-Grid Power System
3.5.2  Relevant Standard For Off-Grid Wind Turbine
3.5.3  Related Standard Of Pv
3.5.4  Battery Standard
3.5.5  Balance System Standards
3.5.6  Diesel Generator Standard
3.5.7  The Standards For Rural Grid
3.5.8  Civil Works Relating Standards For Housing
4.  Existing Regulations For Pv/Wind Power Plant In China
4.1   Regulations Of Sddx Program
4.2   Operation And Management Regulations For Sino-Germany Financial Copperation “Western Solar Energy” Program.
4.2.1  Selection Criteria For The Plant Sites
4.2.2  Inspection Acceptance Procedure For Kfw Program
4.2.3  Regulations Of Operation And Management For Kfw Program
4.3   Operation Management Method For Other Projects
5.  Weakness And Shortage Of Chinese Existing Related Standards And Regulations For Re Off-Grid Pv /Wind Power Plant
5.1   Weakness And Shortage Of Chinese Existing Related Standards And Regulations For Re Off-Grid Pv /Wind Power Plant
5.1.1  Without Standards For Sitting Re Off-Grid Power Plant
5.1.2  Design Regulations For System Optimization
5.1.3  Pv Standards Are Not Been Followed Seriously
5.1.4  There Are No Special Storage Battery Standards
5.1.5  Shortage Of Controller Standards
5.1.6  Mini-Grid Power Quality Standard
5.1.7  Regulations For Mini-Grid Power System Inspection And Acceptance
5.2   Existing Problems In Regulations And Standards Of Off-Grid Pv/Wind Power Plant
5.2.1  Concept Of Project Target Of Power Supply Service Is Underemphasized
5.2.2  Identification Of Unelectrified Households
5.2.3  Power Supply Quality Is Not Clearly Regulated And No Quantitative Index To Estimate
5.2.4  The Owners Are Not Determined
5.2.5  Most Of Power Plant Have Not Got Power Business Permit
5.2.6  The Power Supply Contract Is Not Clear.
5.2.7  Uncompleted Training Mechanism
6.  Suggestions
6.1   Suggestions On Compiling New Standards
6.2   Suggestions For Complementing Necessary Regulations
6.2.1  Necessary Regulations For Government Administrative Department And Launch Department
6.2.2  Regulations For Owner
6.3   The Procedure To Develop New Standards
6.3.1  National Standards Development
6.3.2  Developing Other Standards
6.3.3  Principles Of Formulating Standards
Reference:
Annex:
Annex1:  Reference Standard And Regulation List
Annex2:  Ndrc Office Notice For Power Construction In No Power Area
Annex3:  Ndrc Notice For Rural Grid Improvement And Power Construction In No Power Area In The Period "11th Five Years Plan"
Annex4:  Renewable Energy Law Of The People’S Republic Of China
Annex5:  Technical Rule For The Rural Grid Construction And Improvement
Annex6:  Quality Of Management Regulation For The Rural Grid Construction And Improvement
Annex7:  Inspection Rule For The Rural Grid Construction And Improvement
Annex8:  Statistic Method For Reliability Of Power Supply
Annex9:  Qinghai Sddx Project Management Regulation
Annex10: Operator Duty Of Pv Plant In Xinjinag Kfw Project
Annex11: Management Regulation Of Pv Plant In Yunnan Kfw Project
Annex12: Management Regulation Of Pv Plant In Qinghai Kfw Project
Annex13: Standardization Law Of The People’S Republic Of China
Annex14: Regulations On Management Of License Of Power Business
Annex15: Regulations On Supply And Utilization Of Electricity 
 